Showing posts with label Single Camera Drama. Show all posts
Showing posts with label Single Camera Drama. Show all posts
Tuesday, 3 June 2014
The Shadowing Focus group
I participated in a focus group in a lesson between me and two others. This gave me the chance to get a small amount of feedback and opinion on the idea. I pitched my short movie idea and I got positive feedback. This has got me and my group excited to start filming and editing our idea.
48 hour film project Complete
We finished editing our project which we was pleased with but we was unable to export it. We found this was due to one of the handy cams we used and was our own fault for not doing test runs with the camera. But we have learned from this for next time but we are pleased with how our project looks. Our team was me, Reggie, Shaun and Ellis who all pitched in with directing, ideas, camera work and editing. We found that our pre production work needs more motivation to do it as it will help us with our work in the long run. We screened our project to the class and due to rendering problems some of the soundtrack and voice overs had been deleted so some scenes did not make much sense. But we got positive feedback for our Parody Documentary and was told camera work throughout was well planned and shot well. This has been good practise for my Single Camera Drama.
48 hour film project Filming 2
16/09/13
In our morning session we went out filming for 3 hours were we did our previous interview and changed the character profile around. We decided to do this as a more rude boy kind of character fit better for our audience and made the scene more funny for the audience. In the afternoon we spent a further 2 hours editing. During this editing we fit in a soundtrack to our intro to the programme, and also added new footage and a soft voice for a voice over to give the project a better look and feel of a documentary.
16/48 hours
48 hour film project Filming 1
11/09/13
During lunch breaks we grabbed a handheld camera and spent 3 hours filming our project. We got over half the footage we needed and all our interviews with the students done. In the afternoon we grouped all our footage and began editing and putting it all into sequence. We did not have any problems when filming, it all went through in a few goes of trying. When editing we got all our shots into place where we wanted them but did not make time to cut the shots how we wanted them so we left that for another time.
11/48 hours
48 hour film project pre production
09/09/13
Our group discussed a project idea we decided on a inbetweeners type programme but soon changed this to a new idea of a comedy sketch of student life at college. We developed a draft script as the idea will be improvised to make it feel real. And finished up the rest of the ore production in the afternoon.
5 hours
Diary entry Jel
October 8th filming began for Jel the musical. The Opening scene for Jel was shot and edited in the same day. The following day more filming was shot. Dialogue scenes where shot and edited. These scenes came up with sound difficulties and were reshot two weeks later on 22nd of October. Filming was then delayed due to equipment issues and was carried on, on November the 7th, The first musical scene was filmed at a home location. Shooting appeared difficult but was eventually done to a good standard, although when edited we found the microphone was not tested properly and singing and dialogue was not picked up well and so we decided to reshoot which eventually was done mid November.
On Monday the 25th of November our lead female role dropped out causing massive issue in filming as her part will now have to be either recasted or the entire production will have to go back into pre production and changed for the script to work without the role. After a week of trying to replace the lead female role we found we couldnt get her replaced in time for the project to be completed.
On Monday the 2nd of December the entire Jel the musical project was dropped and cancelled and the team got straight to work on a new project called 'The Shadowing'
On Monday the 25th of November our lead female role dropped out causing massive issue in filming as her part will now have to be either recasted or the entire production will have to go back into pre production and changed for the script to work without the role. After a week of trying to replace the lead female role we found we couldnt get her replaced in time for the project to be completed.
On Monday the 2nd of December the entire Jel the musical project was dropped and cancelled and the team got straight to work on a new project called 'The Shadowing'
Tuesday, 21 January 2014
Friday, 20 December 2013
Tuesday, 17 December 2013
The Shadowing Soundtrack Planning
For our movie we decided on using a shotgun microphone attached to our camera. We used this because they pick up sound very well where ever you aim the microphone and cuts out unneeded noises such as wind. Throughout the movie we knew sound effects and foley would be needed for our film and so when filming we acted as if we would hear someone or something and would later edit this in. We got all of our soundtrack and foley sounds from the application soundtrack pro.
List of Sound Recordings:
Mud Footsteps (Foley)
Dinosaur Roar (Soundtrack Pro Sound Effect)
Bass Effect (Download)
Stick Breaking (Foley)
Abstract 34 (Sondtrack Pro)
Abstract 48 (Soundtrack Pro)
Bone Break 1 (Foley)
Bone Break 2 (Foley)
Static Wave (Soundtrack Pro Edited)
Scrambling Microphone (Self Recorded)
The Shadowing Location Report Magnolia Woods
Location- Magnolia Woods
Address:Rochford
Contact Person: Rochford Council
Position: Council
Phone Number: 08455212345
Email address: @Rochfordcouncil.com
Feasible shooting space
there re lots of open areas to film in within
Electricity
no electricity is available so if we need power we will have to supply a separate source of power.
Audio
there could be some wind picked up by the micro phone so we have taken a shot gun mic and a protector for wind noise.
Lighting
It is natural lighting from the sun
Set
What will be in the background: Will consist of trees plans and gravel dirt
Logistics
How long will it take to get there: From college to magnolia it takes about 15 minutes in car to get there.
Parking (disabled access): car park with loads of spaces
The Shadowing Risk Assessment Magnolia woods
Risk Assessment Magnolia Woods
RISK ASSESSMENT RECORD
Production / Activity
|
Forest Light Pictures
| |||
Location
|
Magnolia Woods
| |||
Date & Duration
|
4/12/13
| |||
Description of Work Activity
|
Reggie, Shaun, Rob and George
| |||
Hazard
|
Hazard Present
|
DETAILS
| ||
Identification
| Yes |
NO
| ||
00. Extra Production Equipment (Jib, Track etc.)
|
NO
| |||
01. Access / Exits
|
NO
| |||
02. Animals (domestic or wild)
|
NO
| |||
03. Audiences
|
NO
| |||
04. Biological Agents / Infection / Illness / Injury
|
YES
|
DIRTY POND
| ||
05. Cables
|
NO
| |||
06. Civil Unrest / Crime
|
NO
| |||
07. Confined Spaces
|
NO
| |||
08. Cranes / Hoists
|
NO
| |||
09. Derelict Buildings
|
NO
| |||
10. Electricity or Gas (other than normal supplies)
|
NO
| |||
11. Explosives / Incendiaries
|
NO
| |||
12. Fire / Flammable Materials
|
NO
| |||
13. Firearms / Weapons
|
NO
| |||
14. Flying
|
NO
| |||
15. Hazardous Substances
|
NO
| |||
16. Hazardous Terrain
|
YES
|
TREES AND WEATHER
| ||
17. Heat / Cold / Extreme Weather
|
YES
|
COLD
| ||
18. Inexperience
|
NO
| |||
19. Lasers / Stroboscopic Effects
|
NO
| |||
20. Machinery / Industry
|
NO
| |||
21. Manual Handling / Lifting
|
NO
| |||
22. Night Operations / Difficult Lighting Conditions
|
YES
|
NIGHT FILMING
| ||
23. Noise / High Sound Levels
|
NO
| |||
24. Personal Protective Equipment
|
NO
| |||
25. Physical Exertion
|
NO
| |||
26. Public / Crowds
|
YES
|
GENERAL PUBLIC
| ||
27. Pyrotechnics
|
NO
| |||
28. Radiation
|
NO
| |||
29. Roads / Motorways
|
NO
| |||
30. Scaffolds / Rostra
|
NO
| |||
31. Special Effects
|
NO
| |||
32. Special Needs (children, disabilities etc.)
|
NO
| |||
33. Specialist Equipment
|
YES
|
CAMERA/ MICROPHONE
| ||
34. Specialist Rescue / First Aid
|
NO
| |||
35. Stunts / Dangerous Activities
|
NO
| |||
36. Transportation
|
YES
|
CAR
| ||
37. Tools
|
NO
| |||
38. Underwater / Underground
|
NO
| |||
39. Vehicles / Speed
|
NO
| |||
40. Water / Proximity to Water
|
YES
|
POND
| ||
41. Working at Height
|
NO
| |||
The Shadowing Risk Assessment Classroom
RISK ASSESSMENT RECORD
Production / Activity
|
Forest Light Pictures
| |||
Location
|
Class room
| |||
Date & Duration
|
4/12/13
| |||
Description of Work Activity
|
Reggie, Shaun, Rob and George
| |||
Hazard
|
Hazard Present
|
DETAILS
| ||
Identification
|
YES
|
NO
| ||
00. Extra Production Equipment (Jib, Track etc.)
|
NO
| |||
01. Access / Exits
|
NO
| |||
02. Animals (domestic or wild)
|
NO
| |||
03. Audiences
|
NO
| |||
04. Biological Agents / Infection / Illness / Injury
|
NO
| |||
05. Cables
|
NO
| |||
06. Civil Unrest / Crime
|
NO
| |||
07. Confined Spaces
|
NO
| |||
08. Cranes / Hoists
|
NO
| |||
09. Derelict Buildings
|
NO
| |||
10. Electricity or Gas (other than normal supplies)
|
NO
| |||
11. Explosives / Incendiaries
|
NO
| |||
12. Fire / Flammable Materials
|
NO
| |||
13. Firearms / Weapons
|
NO
| |||
14. Flying
|
NO
| |||
15. Hazardous Substances
|
YES
|
COMPUTERS
| ||
16. Hazardous Terrain
|
NO
| |||
17. Heat / Cold / Extreme Weather
|
NO
| |||
18. Inexperience
|
NO
| |||
19. Lasers / Stroboscopic Effects
|
NO
| |||
20. Machinery / Industry
|
NO
| |||
21. Manual Handling / Lifting
|
NO
| |||
22. Night Operations / Difficult Lighting Conditions
|
NO
| |||
23. Noise / High Sound Levels
|
YES
| |||
24. Personal Protective Equipment
|
NO
| |||
25. Physical Exertion
|
NO
| |||
26. Public / Crowds
|
YES
|
GENERAL PUBLIC
| ||
27. Pyrotechnics
|
NO
| |||
28. Radiation
|
NO
| |||
29. Roads / Motorways
|
NO
| |||
30. Scaffolds / Rostra
|
NO
| |||
31. Special Effects
|
NO
| |||
32. Special Needs (children, disabilities etc.)
|
NO
| |||
33. Specialist Equipment
|
YES
|
CAMERA/ MICROPHONE
| ||
34. Specialist Rescue / First Aid
|
NO
| |||
35. Stunts / Dangerous Activities
|
NO
| |||
36. Transportation
|
YES
|
CAR
| ||
37. Tools
|
NO
| |||
38. Underwater / Underground
|
NO
| |||
39. Vehicles / Speed
|
NO
| |||
40. Water / Proximity to Water
|
NO
| |||
41. Working at Height
|
NO
| |||
Subscribe to:
Posts (Atom)





