Showing posts with label Single Camera Drama. Show all posts
Showing posts with label Single Camera Drama. Show all posts

Tuesday, 3 June 2014

The Shadowing Focus group

I participated in a focus group in a lesson between  me and two others. This gave me the chance to get a small amount of feedback and opinion on the idea. I pitched my short movie idea and I got positive feedback. This has got me and my group excited to start filming and editing our idea.

48 hour film project Complete

We finished editing our project which we was pleased with but we was unable to export it. We found this was due to one of the handy cams we used and was our own fault for not doing test runs with the camera. But we have learned from this for next time but we are pleased with how our project looks. Our team was me, Reggie, Shaun and Ellis who all pitched in with directing, ideas, camera work and editing. We found that our pre production work needs more motivation to do it as it will help us with our work in the long run. We screened our project to the class and due to rendering problems some of the soundtrack and voice overs had been deleted so some scenes did not make much sense. But we got positive feedback for our Parody Documentary and was told camera work throughout was well planned and shot well. This has been good practise for my Single Camera Drama.

48 hour film project Filming 2

16/09/13
In our morning session we went out filming for 3 hours were we did our previous interview and changed the character profile around. We decided to do this as a more rude boy kind of character fit better for our audience and made the scene more funny for the audience. In the afternoon we spent a further 2 hours editing. During this editing we fit in a soundtrack to our intro to the programme, and also added new footage and a soft voice for a voice over to give the project a better look and feel of a documentary.

16/48 hours

48 hour film project Filming 1

11/09/13
During lunch breaks we grabbed a handheld camera and spent 3 hours filming our project. We got over half the footage we needed and all our interviews with the students done. In the afternoon we grouped all our footage and began editing and putting it all into sequence. We did not have any problems when filming, it all went through in a few goes of trying. When editing we got all our shots into place where we wanted them but did not make time to cut the shots how we wanted them so we left that for another time.

11/48 hours

48 hour film project pre production

09/09/13 
Our group discussed a project idea we decided on a inbetweeners type programme but soon changed this to a new idea of a comedy sketch of student life at college. We developed a draft script as the idea will be improvised to make it feel real. And finished up the rest of the ore production in the afternoon.

5 hours

Diary entry Jel

October 8th filming began for Jel the musical. The Opening scene for Jel was shot and edited in the same day. The following day more filming was shot. Dialogue scenes where shot and edited. These scenes came up with sound difficulties and were reshot two weeks later on 22nd of October. Filming was then delayed due to equipment issues and was carried on, on November the 7th, The first musical scene was filmed at a home location. Shooting appeared difficult but was eventually done to a good standard, although when edited we found the microphone was not tested properly and singing and dialogue was not picked up well and so we decided to reshoot which eventually was done mid November.
On Monday the 25th of November our lead female role dropped out causing massive issue in filming as her part will now have to be either recasted or the entire production will have to go back into pre production and changed for the script to work without the role. After a week of trying to replace the lead female role we found we couldnt get her replaced in time for the project to be completed.
On Monday the 2nd of December the entire Jel the musical project was dropped and cancelled and the team got straight to work on a new project called 'The Shadowing'

Tuesday, 17 December 2013

The Shadowing 10 Minute Version

The Shadowing Soundtrack Planning

For our movie we decided on using a shotgun microphone attached to our camera. We used this because they pick up sound very well where ever you aim the microphone and cuts out unneeded noises such as wind. Throughout the movie we knew sound effects and foley would be needed for our film and so when filming we acted as if we would hear someone or something and would later edit this in. We got all of our soundtrack and foley sounds from the application soundtrack pro. 

List of Sound Recordings:

Mud Footsteps (Foley)
Dinosaur Roar (Soundtrack Pro Sound Effect)
Bass Effect (Download)
Stick Breaking (Foley)
Abstract 34 (Sondtrack Pro)
Abstract 48 (Soundtrack Pro)
Bone Break 1 (Foley)
Bone Break 2 (Foley)
Static Wave (Soundtrack Pro Edited)
Scrambling Microphone (Self Recorded)

The Shadowing Location Report Magnolia Woods

Location- Magnolia Woods
Address:Rochford
Contact Person: Rochford Council 
Position: Council 
Phone Number: 08455212345
Email address: @Rochfordcouncil.com

Feasible shooting space
there re lots of open areas to film in within 

Electricity
no electricity is available so if we need power we will have to supply a separate source of power.

Audio
there could be some wind picked up by the micro phone so we have taken a shot gun mic and a protector for wind noise.

Lighting
It is natural lighting from the sun
Set
What will be in the background:  Will consist of trees plans and gravel dirt
Logistics
How long will it take to get there: From college to magnolia it takes about 15 minutes in car to get there.
Parking (disabled access): car park with loads of spaces

The Shadowing Risk Assessment Magnolia woods

Risk Assessment Magnolia Woods

                                RISK ASSESSMENT RECORD



Production / Activity
Forest Light Pictures
Location
Magnolia Woods
Date & Duration
4/12/13
Description of Work Activity
Reggie, Shaun, Rob and George


Hazard

Hazard Present
DETAILS

Identification

Yes
NO

00. Extra Production Equipment (Jib, Track etc.)

NO

01. Access / Exits

NO

02. Animals (domestic or wild)

NO

03. Audiences

NO

04. Biological Agents / Infection / Illness / Injury
YES

DIRTY POND
05. Cables

NO

06. Civil Unrest / Crime

NO

07. Confined Spaces

NO

08. Cranes / Hoists

NO

09. Derelict Buildings

NO

10. Electricity or Gas (other than normal supplies)

NO

11. Explosives / Incendiaries

NO

12. Fire / Flammable Materials

NO

13. Firearms / Weapons

NO

14. Flying

NO

15. Hazardous Substances

NO

16. Hazardous Terrain
YES

TREES AND WEATHER
17. Heat / Cold / Extreme Weather
YES

COLD
18. Inexperience

NO

19. Lasers / Stroboscopic Effects

NO

20. Machinery / Industry

NO

21. Manual Handling / Lifting

NO

22. Night Operations / Difficult Lighting Conditions
YES

NIGHT FILMING
23. Noise / High Sound Levels

NO

24. Personal Protective Equipment

NO

25. Physical Exertion

NO

26. Public / Crowds
YES

GENERAL PUBLIC
27. Pyrotechnics

NO

28. Radiation

NO

29. Roads / Motorways

NO

30. Scaffolds / Rostra

NO

31. Special Effects

NO

32. Special Needs (children, disabilities etc.)

NO

33. Specialist Equipment
YES

CAMERA/ MICROPHONE
34. Specialist Rescue / First Aid

NO

35. Stunts / Dangerous Activities

NO

36. Transportation
YES

CAR
37. Tools

NO

38. Underwater / Underground

NO

39. Vehicles / Speed

NO

40. Water / Proximity to Water
YES

POND
41. Working at Height

NO

The Shadowing Risk Assessment Classroom



                                          RISK ASSESSMENT RECORD

Production / Activity
Forest Light Pictures
Location
Class room
Date & Duration
4/12/13
Description of Work Activity
Reggie, Shaun, Rob and George


Hazard

Hazard Present
DETAILS

Identification

YES

NO

00. Extra Production Equipment (Jib, Track etc.)

NO

01. Access / Exits

NO

02. Animals (domestic or wild)

NO

03. Audiences

NO

04. Biological Agents / Infection / Illness / Injury

NO

05. Cables

NO

06. Civil Unrest / Crime

NO

07. Confined Spaces

NO

08. Cranes / Hoists

NO

09. Derelict Buildings

NO

10. Electricity or Gas (other than normal supplies)

NO

11. Explosives / Incendiaries

NO

12. Fire / Flammable Materials

NO

13. Firearms / Weapons

NO

14. Flying

NO

15. Hazardous Substances
YES

COMPUTERS
16. Hazardous Terrain

NO

17. Heat / Cold / Extreme Weather

NO

18. Inexperience

NO

19. Lasers / Stroboscopic Effects

NO

20. Machinery / Industry

NO

21. Manual Handling / Lifting

NO

22. Night Operations / Difficult Lighting Conditions

NO

23. Noise / High Sound Levels
YES


24. Personal Protective Equipment

NO

25. Physical Exertion

NO

26. Public / Crowds
YES

GENERAL PUBLIC
27. Pyrotechnics

NO

28. Radiation

NO

29. Roads / Motorways

NO

30. Scaffolds / Rostra

NO

31. Special Effects

NO

32. Special Needs (children, disabilities etc.)

NO

33. Specialist Equipment
YES

CAMERA/ MICROPHONE
34. Specialist Rescue / First Aid

NO

35. Stunts / Dangerous Activities

NO

36. Transportation
YES

CAR
37. Tools

NO

38. Underwater / Underground

NO

39. Vehicles / Speed

NO

40. Water / Proximity to Water

NO

41. Working at Height

NO